Frage 1 von 35
Antwort anzeigen
Antwort: C. Before high risk construction work starts
The PCBU must make sure a SWMS is prepared before the high risk construction work starts.
-
Frage 2 von 35
Antwort anzeigen
Antwort: A. The work must stop immediately, or as soon as it is safe, and the SWMS is reviewed
Work must stop and not restart until it can be done in line with the SWMS, which should be reviewed.
-
Frage 3 von 35
Antwort anzeigen
Antwort: A. 2 metres
Work with a risk of a fall of more than 2 metres is high risk construction work and needs a SWMS.
-
Frage 4 von 35
Antwort anzeigen
Antwort: D. 1.5 metres
Work in or near a shaft or trench with an excavated depth of more than 1.5 metres is high risk construction work.
-
Frage 5 von 35
Antwort anzeigen
Antwort: D. Work that is likely to disturb asbestos
Work that involves, or is likely to involve, disturbing asbestos is high risk construction work.
-
Frage 6 von 35
Antwort anzeigen
Antwort: D. Work on or near energised electrical installations
Work on or near energised electrical installations or services is on the high risk construction work list.
-
Frage 7 von 35
Antwort anzeigen
Antwort: B. Work in an area where powered mobile plant is moving
Work in an area with movement of powered mobile plant, such as excavators and loaders, is high risk construction work.
-
Frage 8 von 35
Antwort anzeigen
Antwort: A. $250,000 or more
A principal contractor must be appointed for construction projects valued at $250,000 or more.
-
Frage 9 von 35
Antwort anzeigen
Antwort: A. A WHS management plan
The principal contractor must prepare a written WHS management plan before work begins and make it available to workers.
-
Frage 10 von 35
Antwort anzeigen
Antwort: D. The principal contractor's contact details
Principal contractors must put up signs showing their contact details so people can reach them.
-
Frage 11 von 35
Antwort anzeigen
Antwort: C. A site-specific induction about that site's hazards and procedures
The white card is general. Each workplace also gives a site-specific induction about its own safety issues.
-
Frage 12 von 35
Antwort anzeigen
Antwort: C. A short pre-start meeting about the work, its hazards and controls
Toolbox talks or pre-start meetings help builders, subcontractors and workers share safety information and consult.
-
Frage 13 von 35
Antwort anzeigen
Antwort: D. A health and safety representative (HSR)
Workers can be represented in consultation by an elected health and safety representative.
-
Frage 14 von 35
Antwort anzeigen
Antwort: B. Its safety data sheet (SDS)
White card training covers the purpose of safety data sheets, SWMS and job safety analyses.
-
Frage 15 von 35
Antwort anzeigen
Antwort: D. Install edge protection such as a guardrail system
A physical barrier like a roof perimeter guardrail stops falls. It is more reliable than signs or instructions.
-
Frage 16 von 35
Antwort anzeigen
Antwort: D. Cuts the power fast to reduce the risk of electric shock
RCDs are an engineering control that reduce the risk of electric shock.
-
Frage 17 von 35
Antwort anzeigen
Antwort: C. Stop work, do not disturb it, and tell your supervisor
Do not disturb suspected asbestos. Stop, keep others away and report it so it can be checked and managed.
-
Frage 18 von 35
Antwort anzeigen
Antwort: A. Breathing in its fibres can cause asbestosis, lung cancer and mesothelioma
Asbestos fibres breathed into the lungs can cause serious diseases, often many years later.
-
Frage 19 von 35
Antwort anzeigen
Antwort: C. Only people with special training and a licence
Safe Work Australia says you need special training and a licence to remove asbestos.
-
Frage 20 von 35
Antwort anzeigen
Antwort: D. Dry cutting concrete, brick or stone
Cutting, grinding, drilling or sanding stone, concrete and masonry, especially dry, can release silica dust that causes silicosis.
-
Frage 21 von 35
Antwort anzeigen
Antwort: B. Water suppression (wet cutting) or on-tool dust extraction
Wet cutting, on-tool extraction or local exhaust ventilation capture dust at the source. A respirator is also needed.
-
Frage 22 von 35
Antwort anzeigen
Antwort: A. Work on or with it is banned, except for stone installed before the ban
A national prohibition on engineered stone applies from 1 July 2024 in most jurisdictions.
-
Frage 23 von 35
Antwort anzeigen
Antwort: B. Earplugs or earmuffs
Hearing protection such as earplugs or earmuffs reduces exposure to excessive noise.
-
Frage 24 von 35
Antwort anzeigen
Antwort: C. Using a hoist to lift heavy tools and materials
Mechanical aids like hoists reduce the risk of musculoskeletal injuries from lifting.
-
Frage 25 von 35
Antwort anzeigen
Antwort: C. Separate the plant work zone with physical barriers and a traffic management plan
Physical barriers, exclusion zones and traffic management plans keep people and mobile plant apart.
-
Frage 26 von 35
Antwort anzeigen
Antwort: D. Prohibition: you must not do this
Prohibition signs use a red circle and slash to show an action that is not permitted.
-
Frage 27 von 35
Antwort anzeigen
Antwort: B. You must do this (mandatory)
Blue circle signs are mandatory signs, such as 'hard hats must be worn'.
-
Frage 28 von 35
Antwort anzeigen
Antwort: B. Warning of a hazard that is not likely to be life-threatening
Warning signs have a black triangle on yellow, for example a forklift hazard sign.
-
Frage 29 von 35
Antwort anzeigen
Antwort: B. There is a hazard that is likely to be life-threatening
Danger signs warn of hazards likely to be life-threatening, such as high voltage.
-
Frage 30 von 35
Antwort anzeigen
Antwort: C. Emergency information signs, such as exits and first aid
Emergency information signs, showing exits, safety equipment and first aid, are green with white text or symbols.
-
Frage 31 von 35
Antwort anzeigen
Antwort: D. Immediately after becoming aware of it
Deaths, serious injuries or illnesses and dangerous incidents must be notified to the regulator immediately.
-
Frage 32 von 35
Antwort anzeigen
Antwort: C. Leave it undisturbed until an inspector arrives or gives directions, except to help people or make it safe
The scene must not be disturbed, except to help an injured person, make the site safe or follow police or inspector directions.
-
Frage 33 von 35
Antwort anzeigen
Antwort: B. Report it as a near miss so the cause can be fixed
Near misses and dangerous occurrences should be reported so hazards are fixed before someone is hurt.
-
Frage 34 von 35
Antwort anzeigen
Antwort: B. Stop or refuse the work and tell the PCBU as soon as practicable
Workers can cease unsafe work in these cases, but must tell the PCBU and stay available for suitable alternative work.
-
Frage 35 von 35
Antwort anzeigen
Antwort: D. It can put themselves and others at serious risk
Not working under the influence of drugs or alcohol is one of the safe work practices taught in white card training.