White Card Practice Test (CPCWHS1001) 2026: الاختبار التدريبي 2

الاختبار التدريبي 2 من 2 في «White Card Practice Test (CPCWHS1001)»: 35 من الأسئلة الإضافية مع الإجابات والشروح.

  • السلامة في مكان العمل
  • أستراليا
  • عدد الأسئلة: 60
  • تمت المراجعة في 11 أكتوبر 2026
  1. السؤال 1 من 35

    When must a SWMS be prepared?
    أظهر الإجابة

    الإجابة: C. Before high risk construction work starts

    The PCBU must make sure a SWMS is prepared before the high risk construction work starts.

  2. السؤال 2 من 35

    High risk construction work is not being done the way the SWMS says. What must happen?
    أظهر الإجابة

    الإجابة: A. The work must stop immediately, or as soon as it is safe, and the SWMS is reviewed

    Work must stop and not restart until it can be done in line with the SWMS, which should be reviewed.

  3. السؤال 3 من 35

    Construction work with a risk of a person falling more than how far is high risk construction work?
    أظهر الإجابة

    الإجابة: A. 2 metres

    Work with a risk of a fall of more than 2 metres is high risk construction work and needs a SWMS.

  4. السؤال 4 من 35

    Work in or near a trench deeper than what depth is high risk construction work?
    أظهر الإجابة

    الإجابة: D. 1.5 metres

    Work in or near a shaft or trench with an excavated depth of more than 1.5 metres is high risk construction work.

  5. السؤال 5 من 35

    Which of these jobs is high risk construction work that needs a SWMS?
    أظهر الإجابة

    الإجابة: D. Work that is likely to disturb asbestos

    Work that involves, or is likely to involve, disturbing asbestos is high risk construction work.

  6. السؤال 6 من 35

    Which task is on the list of high risk construction work?
    أظهر الإجابة

    الإجابة: D. Work on or near energised electrical installations

    Work on or near energised electrical installations or services is on the high risk construction work list.

  7. السؤال 7 من 35

    Which of these is classed as high risk construction work?
    أظهر الإجابة

    الإجابة: B. Work in an area where powered mobile plant is moving

    Work in an area with movement of powered mobile plant, such as excavators and loaders, is high risk construction work.

  8. السؤال 8 من 35

    For construction projects worth how much must a principal contractor be appointed?
    أظهر الإجابة

    الإجابة: A. $250,000 or more

    A principal contractor must be appointed for construction projects valued at $250,000 or more.

  9. السؤال 9 من 35

    What must a principal contractor prepare in writing before work on the project begins?
    أظهر الإجابة

    الإجابة: A. A WHS management plan

    The principal contractor must prepare a written WHS management plan before work begins and make it available to workers.

  10. السؤال 10 من 35

    What must the principal contractor's site signs show?
    أظهر الإجابة

    الإجابة: D. The principal contractor's contact details

    Principal contractors must put up signs showing their contact details so people can reach them.

  11. السؤال 11 من 35

    You have a white card and start at a new site. What else should you receive?
    أظهر الإجابة

    الإجابة: C. A site-specific induction about that site's hazards and procedures

    The white card is general. Each workplace also gives a site-specific induction about its own safety issues.

  12. السؤال 12 من 35

    What is a toolbox talk?
    أظهر الإجابة

    الإجابة: C. A short pre-start meeting about the work, its hazards and controls

    Toolbox talks or pre-start meetings help builders, subcontractors and workers share safety information and consult.

  13. السؤال 13 من 35

    Who can represent workers when a PCBU consults them about health and safety?
    أظهر الإجابة

    الإجابة: D. A health and safety representative (HSR)

    Workers can be represented in consultation by an elected health and safety representative.

  14. السؤال 14 من 35

    Where do you find information about a hazardous chemical's dangers, safe handling and first aid?
    أظهر الإجابة

    الإجابة: B. Its safety data sheet (SDS)

    White card training covers the purpose of safety data sheets, SWMS and job safety analyses.

  15. السؤال 15 من 35

    What is the best way to stop people falling from the edge of a roof?
    أظهر الإجابة

    الإجابة: D. Install edge protection such as a guardrail system

    A physical barrier like a roof perimeter guardrail stops falls. It is more reliable than signs or instructions.

  16. السؤال 16 من 35

    What does a residual current device (RCD), or safety switch, do?
    أظهر الإجابة

    الإجابة: D. Cuts the power fast to reduce the risk of electric shock

    RCDs are an engineering control that reduce the risk of electric shock.

  17. السؤال 17 من 35

    You uncover sheeting that you think may contain asbestos. What should you do?
    أظهر الإجابة

    الإجابة: C. Stop work, do not disturb it, and tell your supervisor

    Do not disturb suspected asbestos. Stop, keep others away and report it so it can be checked and managed.

  18. السؤال 18 من 35

    How does asbestos harm people?
    أظهر الإجابة

    الإجابة: A. Breathing in its fibres can cause asbestosis, lung cancer and mesothelioma

    Asbestos fibres breathed into the lungs can cause serious diseases, often many years later.

  19. السؤال 19 من 35

    Who can remove asbestos?
    أظهر الإجابة

    الإجابة: C. Only people with special training and a licence

    Safe Work Australia says you need special training and a licence to remove asbestos.

  20. السؤال 20 من 35

    Which task can release harmful respirable crystalline silica dust?
    أظهر الإجابة

    الإجابة: D. Dry cutting concrete, brick or stone

    Cutting, grinding, drilling or sanding stone, concrete and masonry, especially dry, can release silica dust that causes silicosis.

  21. السؤال 21 من 35

    Which control reduces silica dust when cutting with power tools?
    أظهر الإجابة

    الإجابة: B. Water suppression (wet cutting) or on-tool dust extraction

    Wet cutting, on-tool extraction or local exhaust ventilation capture dust at the source. A respirator is also needed.

  22. السؤال 22 من 35

    What has applied to engineered stone in most of Australia since 1 July 2024?
    أظهر الإجابة

    الإجابة: A. Work on or with it is banned, except for stone installed before the ban

    A national prohibition on engineered stone applies from 1 July 2024 in most jurisdictions.

  23. السؤال 23 من 35

    Which PPE helps protect against excessive noise?
    أظهر الإجابة

    الإجابة: B. Earplugs or earmuffs

    Hearing protection such as earplugs or earmuffs reduces exposure to excessive noise.

  24. السؤال 24 من 35

    Which is an engineering control for manual handling risk?
    أظهر الإجابة

    الإجابة: C. Using a hoist to lift heavy tools and materials

    Mechanical aids like hoists reduce the risk of musculoskeletal injuries from lifting.

  25. السؤال 25 من 35

    How can workers on foot be kept safe from mobile plant?
    أظهر الإجابة

    الإجابة: C. Separate the plant work zone with physical barriers and a traffic management plan

    Physical barriers, exclusion zones and traffic management plans keep people and mobile plant apart.

  26. السؤال 26 من 35

    A sign shows a red circle with a red diagonal line over a black symbol. What does it mean?
    أظهر الإجابة

    الإجابة: D. Prohibition: you must not do this

    Prohibition signs use a red circle and slash to show an action that is not permitted.

  27. السؤال 27 من 35

    What does a sign with a white symbol on a solid blue circle mean?
    أظهر الإجابة

    الإجابة: B. You must do this (mandatory)

    Blue circle signs are mandatory signs, such as 'hard hats must be worn'.

  28. السؤال 28 من 35

    What does a yellow sign with a black triangle usually mean?
    أظهر الإجابة

    الإجابة: B. Warning of a hazard that is not likely to be life-threatening

    Warning signs have a black triangle on yellow, for example a forklift hazard sign.

  29. السؤال 29 من 35

    A sign has the word DANGER in white on a red oval inside a black rectangle. What does it mean?
    أظهر الإجابة

    الإجابة: B. There is a hazard that is likely to be life-threatening

    Danger signs warn of hazards likely to be life-threatening, such as high voltage.

  30. السؤال 30 من 35

    Which signs are green with white symbols or text?
    أظهر الإجابة

    الإجابة: C. Emergency information signs, such as exits and first aid

    Emergency information signs, showing exits, safety equipment and first aid, are green with white text or symbols.

  31. السؤال 31 من 35

    A worker is seriously injured on site. When must the WHS regulator be notified?
    أظهر الإجابة

    الإجابة: D. Immediately after becoming aware of it

    Deaths, serious injuries or illnesses and dangerous incidents must be notified to the regulator immediately.

  32. السؤال 32 من 35

    After a notifiable incident, what must be done with the incident scene?
    أظهر الإجابة

    الإجابة: C. Leave it undisturbed until an inspector arrives or gives directions, except to help people or make it safe

    The scene must not be disturbed, except to help an injured person, make the site safe or follow police or inspector directions.

  33. السؤال 33 من 35

    A tool falls from a scaffold but misses everyone. What should you do?
    أظهر الإجابة

    الإجابة: B. Report it as a near miss so the cause can be fixed

    Near misses and dangerous occurrences should be reported so hazards are fixed before someone is hurt.

  34. السؤال 34 من 35

    You reasonably believe a task would expose you to a serious risk from an immediate hazard. What can you do?
    أظهر الإجابة

    الإجابة: B. Stop or refuse the work and tell the PCBU as soon as practicable

    Workers can cease unsafe work in these cases, but must tell the PCBU and stay available for suitable alternative work.

  35. السؤال 35 من 35

    Why must workers not come to site affected by alcohol or drugs?
    أظهر الإجابة

    الإجابة: D. It can put themselves and others at serious risk

    Not working under the influence of drugs or alcohol is one of the safe work practices taught in white card training.