Domanda 1 di 25
Mostra la risposta
Risposta: D. The top three steps
HSE says do not stand or work on the top three steps of a stepladder.
-
Domanda 2 di 25
Mostra la risposta
Risposta: C. No, never stand a ladder on movable objects
HSE says never stand a ladder on movable objects such as pallets, bricks or vans.
-
Domanda 3 di 25
Mostra la risposta
Risposta: D. Tie both stiles to a suitable point
Tying both stiles is the first choice. Footing the ladder is the last resort.
-
Domanda 4 di 25
Mostra la risposta
Risposta: C. Before first use, then at least every 7 days
Scaffolds must also be inspected after anything likely to affect them, such as bad weather or alterations.
-
Domanda 5 di 25
Mostra la risposta
Risposta: A. Only a competent scaffolder
Scaffolds must be erected, altered and dismantled by competent people. Unauthorised changes can cause collapse or falls.
-
Domanda 6 di 25
Mostra la risposta
Risposta: A. At least 950 mm
The top guardrail must be at least 950 mm above the working platform.
-
Domanda 7 di 25
Mostra la risposta
Risposta: C. 470 mm
The gap between the top rail and the intermediate rail must not be more than 470 mm.
-
Domanda 8 di 25
Mostra la risposta
Risposta: D. To stop people or materials falling off the edge
Toe boards must be suitable and sufficient to prevent people or materials falling.
-
Domanda 9 di 25
Mostra la risposta
Risposta: A. Someone trained under a scheme such as PASMA
Tower erectors must be competent and trained, and must follow the manufacturer's instructions.
-
Domanda 10 di 25
Mostra la risposta
Risposta: D. Avoid going on the roof, for example by working from underneath
Fragile roofs can give way without warning. Avoid working on them where possible.
-
Domanda 11 di 25
Mostra la risposta
Risposta: A. Before use at the start of each shift
Users should do a pre-use check every shift. Detailed inspections are also needed at set intervals.
-
Domanda 12 di 25
Mostra la risposta
Risposta: C. At the start of each shift
CDM 2015 requires excavations to be inspected at the start of each shift and after events such as a fall of material.
-
Domanda 13 di 25
Mostra la risposta
Risposta: B. Their weight can make the sides collapse
Loads near the edge can cause collapse. Edge protection and stop blocks also help prevent falls.
-
Domanda 14 di 25
Mostra la risposta
Risposta: B. Raise the alarm and do not go in unless trained to rescue
Many people who die in confined spaces were trying to rescue others. Only trained rescuers with the right equipment should go in.
-
Domanda 15 di 25
Mostra la risposta
Risposta: C. Harmful gases or a lack of oxygen
Confined spaces can contain toxic gases or too little oxygen. Work in them needs training and a safe system of work.
-
Domanda 16 di 25
Mostra la risposta
Risposta: C. So more can be reused or recycled
Separating waste supports the waste hierarchy: reduce, reuse and recycle before disposal.
-
Domanda 17 di 25
Mostra la risposta
Risposta: A. Reduce the amount of waste you create
Preventing waste comes first, then reuse, recycling, recovery and finally disposal.
-
Domanda 18 di 25
Mostra la risposta
Risposta: A. Use the spill kit to stop it reaching drains, and report it
Fuel can pollute land and water. Contain it with a spill kit and report it at once.
-
Domanda 19 di 25
Mostra la risposta
Risposta: D. In bunded containers or on drip trays, away from drains
Secondary containment such as bunds and drip trays catches leaks and spills.
-
Domanda 20 di 25
Mostra la risposta
Risposta: D. Only in the designated washout area
Concrete washings are harmful to water life. Never let them reach drains or watercourses.
-
Domanda 21 di 25
Mostra la risposta
Risposta: A. Stop work in that area and report it
Nesting wild birds are protected by law. Report the find so a specialist can advise.
-
Domanda 22 di 25
Mostra la risposta
Risposta: C. Stop work and report it
Bats and their roosts are protected by law. Work must stop until advice is taken.
-
Domanda 23 di 25
Mostra la risposta
Risposta: B. Do not disturb it and report it
Japanese knotweed is an invasive plant. Moving or spreading it can break the law.
-
Domanda 24 di 25
Mostra la risposta
Risposta: C. To cut noise, fumes and fuel waste
Idling engines create noise and air pollution and waste fuel.
-
Domanda 25 di 25
Mostra la risposta
Risposta: D. Control dust and noise, and keep to the agreed working hours
Dust, noise and mud can harm neighbours and the environment and lead to complaints and enforcement.