CSCS Test Practice (CITB HS&E Operatives) 2026: الاختبار التدريبي 4
الاختبار التدريبي 4 من 5 في «CSCS Test Practice (CITB HS&E Operatives)»: 25 من الأسئلة الإضافية مع الإجابات والشروح.
-
السؤال 1 من 25
أظهر الإجابة
الإجابة: D. The top three steps
HSE says do not stand or work on the top three steps of a stepladder.
-
السؤال 2 من 25
أظهر الإجابة
الإجابة: C. No, never stand a ladder on movable objects
HSE says never stand a ladder on movable objects such as pallets, bricks or vans.
-
السؤال 3 من 25
أظهر الإجابة
الإجابة: D. Tie both stiles to a suitable point
Tying both stiles is the first choice. Footing the ladder is the last resort.
-
السؤال 4 من 25
أظهر الإجابة
الإجابة: C. Before first use, then at least every 7 days
Scaffolds must also be inspected after anything likely to affect them, such as bad weather or alterations.
-
السؤال 5 من 25
أظهر الإجابة
الإجابة: A. Only a competent scaffolder
Scaffolds must be erected, altered and dismantled by competent people. Unauthorised changes can cause collapse or falls.
-
السؤال 6 من 25
أظهر الإجابة
الإجابة: A. At least 950 mm
The top guardrail must be at least 950 mm above the working platform.
-
السؤال 7 من 25
أظهر الإجابة
الإجابة: C. 470 mm
The gap between the top rail and the intermediate rail must not be more than 470 mm.
-
السؤال 8 من 25
أظهر الإجابة
الإجابة: D. To stop people or materials falling off the edge
Toe boards must be suitable and sufficient to prevent people or materials falling.
-
السؤال 9 من 25
أظهر الإجابة
الإجابة: A. Someone trained under a scheme such as PASMA
Tower erectors must be competent and trained, and must follow the manufacturer's instructions.
-
السؤال 10 من 25
أظهر الإجابة
الإجابة: D. Avoid going on the roof, for example by working from underneath
Fragile roofs can give way without warning. Avoid working on them where possible.
-
السؤال 11 من 25
أظهر الإجابة
الإجابة: A. Before use at the start of each shift
Users should do a pre-use check every shift. Detailed inspections are also needed at set intervals.
-
السؤال 12 من 25
أظهر الإجابة
الإجابة: C. At the start of each shift
CDM 2015 requires excavations to be inspected at the start of each shift and after events such as a fall of material.
-
السؤال 13 من 25
أظهر الإجابة
الإجابة: B. Their weight can make the sides collapse
Loads near the edge can cause collapse. Edge protection and stop blocks also help prevent falls.
-
السؤال 14 من 25
أظهر الإجابة
الإجابة: B. Raise the alarm and do not go in unless trained to rescue
Many people who die in confined spaces were trying to rescue others. Only trained rescuers with the right equipment should go in.
-
السؤال 15 من 25
أظهر الإجابة
الإجابة: C. Harmful gases or a lack of oxygen
Confined spaces can contain toxic gases or too little oxygen. Work in them needs training and a safe system of work.
-
السؤال 16 من 25
أظهر الإجابة
الإجابة: C. So more can be reused or recycled
Separating waste supports the waste hierarchy: reduce, reuse and recycle before disposal.
-
السؤال 17 من 25
أظهر الإجابة
الإجابة: A. Reduce the amount of waste you create
Preventing waste comes first, then reuse, recycling, recovery and finally disposal.
-
السؤال 18 من 25
أظهر الإجابة
الإجابة: A. Use the spill kit to stop it reaching drains, and report it
Fuel can pollute land and water. Contain it with a spill kit and report it at once.
-
السؤال 19 من 25
أظهر الإجابة
الإجابة: D. In bunded containers or on drip trays, away from drains
Secondary containment such as bunds and drip trays catches leaks and spills.
-
السؤال 20 من 25
أظهر الإجابة
الإجابة: D. Only in the designated washout area
Concrete washings are harmful to water life. Never let them reach drains or watercourses.
-
السؤال 21 من 25
أظهر الإجابة
الإجابة: A. Stop work in that area and report it
Nesting wild birds are protected by law. Report the find so a specialist can advise.
-
السؤال 22 من 25
أظهر الإجابة
الإجابة: C. Stop work and report it
Bats and their roosts are protected by law. Work must stop until advice is taken.
-
السؤال 23 من 25
أظهر الإجابة
الإجابة: B. Do not disturb it and report it
Japanese knotweed is an invasive plant. Moving or spreading it can break the law.
-
السؤال 24 من 25
أظهر الإجابة
الإجابة: C. To cut noise, fumes and fuel waste
Idling engines create noise and air pollution and waste fuel.
-
السؤال 25 من 25
أظهر الإجابة
الإجابة: D. Control dust and noise, and keep to the agreed working hours
Dust, noise and mud can harm neighbours and the environment and lead to complaints and enforcement.
لوحة المفاتيح: 1–4 للإجابة، وEnter للسؤال التالي.
الاختبار الحقيقي: 45 of 50 (90%)