CSCS Test Practice (CITB HS&E Operatives) 2026: Practice test 4
Practice test 4 of 5 for the CSCS Test Practice (CITB HS&E Operatives): 25 more questions with answers and explanations.
-
Question 1 of 25
Show answer
Answer: D. The top three steps
HSE says do not stand or work on the top three steps of a stepladder.
-
Question 2 of 25
Show answer
Answer: C. No, never stand a ladder on movable objects
HSE says never stand a ladder on movable objects such as pallets, bricks or vans.
-
Question 3 of 25
Show answer
Answer: D. Tie both stiles to a suitable point
Tying both stiles is the first choice. Footing the ladder is the last resort.
-
Question 4 of 25
Show answer
Answer: C. Before first use, then at least every 7 days
Scaffolds must also be inspected after anything likely to affect them, such as bad weather or alterations.
-
Question 5 of 25
Show answer
Answer: A. Only a competent scaffolder
Scaffolds must be erected, altered and dismantled by competent people. Unauthorised changes can cause collapse or falls.
-
Question 6 of 25
Show answer
Answer: A. At least 950 mm
The top guardrail must be at least 950 mm above the working platform.
-
Question 7 of 25
Show answer
Answer: C. 470 mm
The gap between the top rail and the intermediate rail must not be more than 470 mm.
-
Question 8 of 25
Show answer
Answer: D. To stop people or materials falling off the edge
Toe boards must be suitable and sufficient to prevent people or materials falling.
-
Question 9 of 25
Show answer
Answer: A. Someone trained under a scheme such as PASMA
Tower erectors must be competent and trained, and must follow the manufacturer's instructions.
-
Question 10 of 25
Show answer
Answer: D. Avoid going on the roof, for example by working from underneath
Fragile roofs can give way without warning. Avoid working on them where possible.
-
Question 11 of 25
Show answer
Answer: A. Before use at the start of each shift
Users should do a pre-use check every shift. Detailed inspections are also needed at set intervals.
-
Question 12 of 25
Show answer
Answer: C. At the start of each shift
CDM 2015 requires excavations to be inspected at the start of each shift and after events such as a fall of material.
-
Question 13 of 25
Show answer
Answer: B. Their weight can make the sides collapse
Loads near the edge can cause collapse. Edge protection and stop blocks also help prevent falls.
-
Question 14 of 25
Show answer
Answer: B. Raise the alarm and do not go in unless trained to rescue
Many people who die in confined spaces were trying to rescue others. Only trained rescuers with the right equipment should go in.
-
Question 15 of 25
Show answer
Answer: C. Harmful gases or a lack of oxygen
Confined spaces can contain toxic gases or too little oxygen. Work in them needs training and a safe system of work.
-
Question 16 of 25
Show answer
Answer: C. So more can be reused or recycled
Separating waste supports the waste hierarchy: reduce, reuse and recycle before disposal.
-
Question 17 of 25
Show answer
Answer: A. Reduce the amount of waste you create
Preventing waste comes first, then reuse, recycling, recovery and finally disposal.
-
Question 18 of 25
Show answer
Answer: A. Use the spill kit to stop it reaching drains, and report it
Fuel can pollute land and water. Contain it with a spill kit and report it at once.
-
Question 19 of 25
Show answer
Answer: D. In bunded containers or on drip trays, away from drains
Secondary containment such as bunds and drip trays catches leaks and spills.
-
Question 20 of 25
Show answer
Answer: D. Only in the designated washout area
Concrete washings are harmful to water life. Never let them reach drains or watercourses.
-
Question 21 of 25
Show answer
Answer: A. Stop work in that area and report it
Nesting wild birds are protected by law. Report the find so a specialist can advise.
-
Question 22 of 25
Show answer
Answer: C. Stop work and report it
Bats and their roosts are protected by law. Work must stop until advice is taken.
-
Question 23 of 25
Show answer
Answer: B. Do not disturb it and report it
Japanese knotweed is an invasive plant. Moving or spreading it can break the law.
-
Question 24 of 25
Show answer
Answer: C. To cut noise, fumes and fuel waste
Idling engines create noise and air pollution and waste fuel.
-
Question 25 of 25
Show answer
Answer: D. Control dust and noise, and keep to the agreed working hours
Dust, noise and mud can harm neighbours and the environment and lead to complaints and enforcement.
Keyboard: 1–4 to answer, Enter for the next question.
The real test: 45 of 50 (90%)