PassEveryTest

Workplace Health and Safety Basics Course (EU):Risk assessment step by step

不限时专题测验:关于Risk assessment step by step的16道题,每道题作答后都有解释。每次题目和选项都会重新打乱。

  • 课程
  • 欧盟
  • 100道题
  • 核对于2026年10月13日
  • 事实核查:2026年10月13日
从课文开始Workplace Health and Safety Basics Course (EU): Lessons:阅读时间约150分钟。测试中的每道题在课文中都有讲解。

专题测验4:Risk assessment step by step

  1. 第1题,共16题

    What is a hazard?
    显示答案

    答案: A. Something with the potential to cause harm

    A hazard is anything at work with the potential to cause harm, such as a wet floor or a chemical.

  2. 第2题,共16题

    How is a risk estimated in a risk assessment?
    显示答案

    答案: D. By the severity and probability of harm

    EU-OSHA's stepwise approach estimates risks from the severity and probability of possible harm.

  3. 第3题,共16题

    What is the first step of EU-OSHA's stepwise approach to risk assessment?
    显示答案

    答案: C. Identifying hazards and those at risk

    Step 1 is identifying hazards and the workers who may be exposed to them.

  4. 第4题,共16题

    Which step comes right after identifying hazards and those at risk?
    显示答案

    答案: A. Evaluating and prioritising risks

    Step 2 is evaluating and prioritising risks, so that the most serious are dealt with first.

  5. 第5题,共16题

    Which step keeps a risk assessment up to date?
    显示答案

    答案: C. Monitoring and reviewing

    The last step is monitoring and reviewing the assessment at regular intervals so it stays up to date.

  6. 第6题,共16题

    You find a risk. According to EU-OSHA, what should you ask first?
    显示答案

    答案: B. Can this risk be eliminated?

    EU-OSHA says assessment should begin from first principles by asking whether the risk can be eliminated.

  7. 第7题,共16题

    Does EU law set one fixed method for carrying out a risk assessment?
    显示答案

    答案: A. No, there are no fixed EU rules; national law applies

    EU-OSHA says there are no fixed rules at EU level on how to carry out a risk assessment; national legislation applies.

  8. 第8题,共16题

    What is OiRA?
    显示答案

    答案: A. An online risk assessment tool from EU-OSHA

    OiRA (Online interactive Risk Assessment) is EU-OSHA's risk assessment tool. OiRA tools follow the stepwise approach.

  9. 第9题,共16题

    Who should take part in a risk assessment?
    显示答案

    答案: A. Workers and their representatives

    Risk assessment records should be drawn up with the consultation and participation of workers and/or their representatives.

  10. 第10题,共16题

    Which item should a risk assessment record include?
    显示答案

    答案: D. Who is responsible for each measure, and by when

    EU-OSHA recommends recording the measures, who is responsible for them and when, as well as the hazards, risks and review dates.

  11. 第11题,共16题

    A shop is preparing its risk assessment. Which tasks should it include?
    显示答案

    答案: A. Tasks done outside normal hours, such as night cleaning

    EU-OSHA says the assessment should cover all relevant hazards and risks, including tasks outside normal working hours.

  12. 第12题,共16题

    Your workplace installs a new packaging machine. What should happen to the risk assessment?
    显示答案

    答案: D. It should be reviewed and updated

    A risk assessment should be revised when circumstances change, for example when new equipment or procedures are introduced.

  13. 第13题,共16题

    Why should a risk assessment note groups of workers who face particular risks, such as young or pregnant workers?
    显示答案

    答案: B. These groups must be protected from the dangers that affect them

    Article 15 of the Framework Directive says particularly sensitive risk groups must be protected against the dangers that specifically affect them.

  14. 第14题,共16题

    Using the lesson's example method (score = likelihood × severity, each from 1 to 3), what is the score for likelihood 2 and severity 3?
    显示答案

    答案: A. 6

    Multiply the two numbers: 2 × 3 = 6. Adding them (5) is a common mistake.

  15. 第15题,共16题

    Using the lesson's example method, which hazard in the table should be dealt with first?
    HazardLikelihood (1–3)Severity (1–3)
    A: hot water urn13
    B: boxes stored in a corridor22
    C: sharp edge on a desk31
    显示答案

    答案: C. B: boxes stored in a corridor

    Scores: A = 1 × 3 = 3, B = 2 × 2 = 4, C = 3 × 1 = 3. B has the highest score, even though A has the highest severity.

  16. 第16题,共16题

    Using the lesson's example bands (1–2 low, 3–4 medium, 6–9 high), how is a risk with likelihood 3 and severity 2 rated?
    显示答案

    答案: B. High

    3 × 2 = 6, and scores from 6 to 9 are rated high in the example method.

相关测试