This course is for security guards and site workers in Saskatchewan who work near road work or guide vehicles on private property. It covers the province's work zone manual and checklists, the safety regulations on traffic, and the rules drivers must follow. It is background knowledge only and does not replace any flagger training your employer or the job requires.
快速解答
这门免费课程包含约30分钟的课文和一套25道题的测试。得分达到80%或以上即可下载结业证书(私人颁发,未经认证)。 已于2026年10月12日根据官方资料核对。
你将学到什么
- Explain where a Saskatchewan guard may direct traffic and who drivers must obey
- Name the Saskatchewan regulations and Ministry manual that govern work zones
- Describe Ministry rules for supervisors, inspections and night work
- Recognize work zone signs and the driver speed rules
- Read a basic two-lane flagging set-up and taper table
- Work safely near traffic without acting like police
得分达到80%或以上即可下载证书。
-
第1题,共25题
显示答案
答案: D. On private property
The province's Private Investigators and Security Guards Program describes guard work as including directing traffic on private property.
-
第2题,共25题
显示答案
答案: A. A police officer or a flagperson
The handbook says drivers must stop when signalled by a police officer or a flagperson.
-
第3题,共25题
显示答案
答案: B. A worker designated under section 9-21 to give signals
Section 1-2 defines a designated signaller as a worker designated under clause 9-21(1)(a) to give signals.
-
第4题,共25题
显示答案
答案: C. Risk from vehicular traffic
Part 9 of the regulations has section 9-21 on designated signallers and section 9-22 on risk from vehicular traffic.
-
第5题,共25题
显示答案
答案: C. The Traffic Control Devices Manual for Work Zones
The Ministry's Construction Manual names the Traffic Control Devices Manual for Work Zones (TCDMWZ) as the guide for employees, contractors and others.
-
第6题,共25题
显示答案
答案: C. They must be adapted, since no one layout fits every site
The Ministry says no one sequence of traffic control devices is universally applicable, so the typical plans are adapted to each site.
-
第7题,共25题
显示答案
答案: B. A certified Traffic Accommodation Supervisor
The contractor must designate a Traffic Accommodation Supervisor who has completed an approved course and holds a valid certificate, and show it on request.
-
第8题,共25题
显示答案
答案: D. 24 hours a day, 7 days a week, until relieved of it
The construction manual says traffic accommodation is provided 24 hours a day, 7 days a week until the contractor is relieved of it.
-
第9题,共25题
显示答案
答案: A. First 30 minutes after sunrise and last 30 before sunset
The Ministry prohibits road work from sunrise to half an hour after, and from half an hour before sunset to sunset.
-
第10题,共25题
显示答案
答案: C. A plan sent one week ahead and accepted by the Ministry
The construction manual requires a night work plan to be submitted one week before night work starts and accepted by the Ministry first.
-
第11题,共25题
显示答案
答案: C. At least three times a day, and when needs change
The Ministry requires device inspections at least three times daily and whenever traffic control requirements change.
-
第12题,共25题
显示答案
答案: A. Black letters or symbols on orange
SGI's handbook says construction signs have black letters or symbols on an orange background.
-
第13题,共25题
显示答案
答案: C. Traffic control person ahead
SGI lists three signs that mark the start of a work zone: Traffic control person ahead, Survey crew ahead and Highway workers.
-
第14题,共25题
显示答案
答案: D. 60 km/h
SGI says drivers must travel 60 km/h or less when passing a worker, flag person or equipment occupied by a worker.
-
第15题,共25题
显示答案
答案: A. No faster than the posted work zone speed
SGI says drivers in a work zone must slow to the posted speed through the entire zone.
-
第16题,共25题
显示答案
答案: A. With photo radar
The handbook says police use photo radar to enforce speed limits in some work zones.
-
第17题,共25题
显示答案
答案: A. 60 km/h
SGI's handbook says the maximum speed when passing Ministry of Highways equipment with lights flashing, moving or not, is 60 km/h.
-
第18题,共25题
显示答案
答案: C. Obeying the work zone speed limit in the whole area
SGI notes that some cities have bylaws requiring drivers to obey work zone speed limits through the entire construction area.
-
第19题,共25题
显示答案
答案: C. At least 125 m
The Ministry checklist says flaggers must be visible to motorists approaching the work zone for at least 125 metres.
-
第20题,共25题
显示答案
答案: B. Two
The checklist requires one flagger when one lane is affected and two when both lanes are affected.
-
第21题,共25题
显示答案
答案: D. 125 m
The checklist's taper table lists a minimum taper of 125 m at 100 km/h, rising to 145 m at 110 km/h.
-
第22题,共25题
显示答案
答案: A. One marked "police" or with a police-style light
Section 18 bars licensees from using a vehicle that shows the word "police" or carries a flashing or rotating light similar to a police service's.
-
第23题,共25题
显示答案
答案: A. Section 23 of the licensing Act
Section 23 of The Private Investigators and Security Guards Act, 1997 says no licensee may hold themselves out in any manner as performing services or duties connected with the police.
-
第24题,共25题
显示答案
答案: D. Support the officer and stop giving your own signals
Police have authority over traffic on public roads, so support them and do not give conflicting signals.
-
第25题,共25题
显示答案
答案: C. Out of the open lane, easy to see, with an escape route
Stand out of the open travel lane where drivers see you early (the Ministry checklist asks that flaggers be visible for at least 125 m), and keep a way to get clear.
键盘:按1–4作答,按 Enter 进入下一题。
考前须知
- Saskatchewan's guard licensing program lists directing traffic on private property as security guard work.
- Drivers must stop when signalled by a police officer or a flagperson.
- In a work zone, drivers must slow to the posted speed through the whole zone and go 60 km/h or less when passing a worker or flag person.
- The Ministry of Highways uses the Traffic Control Devices Manual for Work Zones, and contractors must name a certified Traffic Accommodation Supervisor.
- On the Ministry's two-lane checklist, flaggers must be visible to approaching drivers for at least 125 m.
- Section 9-22 of the Occupational Health and Safety Regulations, 2020 deals with risk from vehicular traffic.
常见问题
Can a Saskatchewan security guard direct traffic?
Guard work can include directing traffic on private property. On public roads, drivers must obey police and flagpersons, so only direct traffic there if you are trained, designated and part of an approved traffic control set-up.
Does this course make me a certified flagperson?
No. It is background knowledge only. Get the training your employer and the job require. On Ministry of Highways contracts, the contractor must also have a Traffic Accommodation Supervisor with a certificate from an approved course.
What is the speed limit past workers in a Saskatchewan work zone?
Drivers must go 60 km/h or less when passing a worker, a flag person or equipment with a worker on it, and obey the posted speed through the rest of the zone.
Which manual sets up work zones on Saskatchewan highways?
The Ministry of Highways uses the Traffic Control Devices Manual for Work Zones, along with its construction manual and traffic accommodation specifications.
这份证书是否经过认证或获得官方认可?
不是。这是一份私人颁发的结业证书,仅用于知识学习。它未获得任何政府、执照发放机构、监管机构或教育机构的认可、认证或批准,也不能替代法律要求的任何执照、资格证书或培训。
资料来源
- Ministry of Highways Construction Manual CM 375-01: Work Zone Traffic Control
- Ministry of Highways: Traffic Accommodation Checklist, Single Lane Closed (Two Lane)
- SGI Saskatchewan Driver's Handbook: Construction signs
- SGI Saskatchewan Driver's Handbook (PDF)
- The Occupational Health and Safety Regulations, 2020