Ontario Traffic Control (Flagger) Course 2026
This course is for security guards and site workers in Ontario who may be asked to direct traffic at road work or a site entrance. It covers Ontario's construction regulation rules for traffic control persons, the STOP/SLOW sign, the high-visibility garment and Book 7 of the Ontario Traffic Manual. It is background knowledge only: Ontario requires your employer to make sure you are competent and to give you written and oral instructions before you direct traffic.
Kort antwoord
Deze gratis cursus heeft ongeveer 30 minuten lessen en een toets van 25 vragen. Haal 80% of meer om een bewijs van deelname te downloaden (privé, niet geaccrediteerd). Gecontroleerd aan de hand van officiële bronnen op 12 oktober 2026.
Wat je leert
- Explain who may direct traffic on Ontario roads and on private property
- Apply the section 69 rules for traffic control persons in O. Reg. 213/91
- Describe the STOP/SLOW sign and the required high-visibility garment
- Recognize Book 7 signs and TCP taper lengths
- Use a before-shift checklist and the traffic protection plan
Haal 80% of meer om je certificaat te downloaden.
-
Vraag 1 van 25
Toon antwoord
Antwoord: C. O. Reg. 213/91 (Construction Projects)
Sections 67 to 69.1 of O. Reg. 213/91 (Construction Projects) cover traffic protection, the STOP/SLOW sign and traffic control persons.
-
Vraag 2 van 25
Toon antwoord
Antwoord: B. A competent worker
Section 69(4) says the worker must be competent. The regulation does not create a provincial TCP licence.
-
Vraag 3 van 25
Toon antwoord
Antwoord: D. Qualified by knowledge, training and experience for the work
A competent person is qualified by knowledge, training and experience, is familiar with the Act and regulations, and knows the dangers of the work.
-
Vraag 4 van 25
Toon antwoord
Antwoord: D. Written and oral instructions in a language they understand
Section 69(4) requires adequate written and oral instructions in a language the worker understands, with a description of the signals.
-
Vraag 5 van 25
Toon antwoord
Antwoord: B. At the project
Section 69(5) says the written instructions must be kept at the project.
-
Vraag 6 van 25
Toon antwoord
Antwoord: C. No more than one lane
Section 69(2) says a worker may not direct more than one lane of traffic moving in the same direction.
-
Vraag 7 van 25
Toon antwoord
Antwoord: C. 90 km/h
Section 69(3) says a worker may not direct traffic where the normal posted speed limit is more than 90 km/h.
-
Vraag 8 van 25
Toon antwoord
Antwoord: C. No, they must do no other work while directing traffic
Section 69(4) says the worker must not do any other work while directing traffic.
-
Vraag 9 van 25
Toon antwoord
Antwoord: D. Where traffic endangers them as little as possible
Section 69(4) requires the worker to be positioned to minimize the risk of being endangered by traffic.
-
Vraag 10 van 25
Toon antwoord
Antwoord: D. An octagon 450 mm between opposite sides
Section 68 calls for an octagonal sign 450 mm between opposite sides.
-
Vraag 11 van 25
Toon antwoord
Antwoord: C. 1.2 m
Section 68 says the sign is mounted on a 1.2 m pole and must be at least as rigid as 6 mm plywood.
-
Vraag 12 van 25
Toon antwoord
Antwoord: C. Fluorescent chartreuse with black letters
The SLOW side is retro-reflective fluorescent chartreuse with a black diamond border and black SLOW letters 120 mm high.
-
Vraag 13 van 25
Toon antwoord
Antwoord: A. Fluorescent blaze or international orange
Section 69.1 requires a garment covering at least the upper body in fluorescent blaze or international orange.
-
Vraag 14 van 25
Toon antwoord
Antwoord: A. In an X pattern
Section 69.1 says the two 5 cm yellow stripes run vertically on the front and form an X on the back.
-
Vraag 15 van 25
Toon antwoord
Antwoord: B. Silver retro-reflective stripes around each arm and leg
Section 69.1(4) requires silver retro-reflective stripes around each arm and leg at night, or equal side stripes of at least 50 cm² per side.
-
Vraag 16 van 25
Toon antwoord
Antwoord: D. The employer; the traffic hazards and the protective measures
Section 67(4) and (5) require each employer to write a plan that identifies the traffic hazards and the measures used to protect workers.
-
Vraag 17 van 25
Toon antwoord
Antwoord: C. At the project, available to an inspector or worker
Section 67(5) says the plan must be kept at the project and made available to an inspector or a worker on request.
-
Vraag 18 van 25
Toon antwoord
Antwoord: C. Book 7 of the Ontario Traffic Manual
Book 7 of the Ontario Traffic Manual, published by MTO, covers temporary conditions such as road work zones.
-
Vraag 19 van 25
Toon antwoord
Antwoord: A. Traffic Control Person Ahead
TC-21 is the Traffic Control Person Ahead sign, placed before the TCP in the advance warning area.
-
Vraag 20 van 25
Toon antwoord
Antwoord: D. 15 m
Book 7's table gives a TCP taper of 15 m at 50 km/h or less, rising to 30 m at 80 and 90 km/h.
-
Vraag 21 van 25
Toon antwoord
Antwoord: C. Asking the road authority about police help
For single-TCP intersection layouts, Book 7 says to consult the road authority about police help when volumes are high or the intersection is signalized.
-
Vraag 22 van 25
Toon antwoord
Antwoord: C. Disobeying a STOP or SLOW sign held by a TCP
The handbook says it is an offence to disobey STOP or SLOW signs displayed by a traffic-control person or firefighter.
-
Vraag 23 van 25
Toon antwoord
Antwoord: B. The fines are doubled
The handbook notes that Highway Traffic Act changes doubled fines for speeding in a construction zone when workers are present.
-
Vraag 24 van 25
Toon antwoord
Antwoord: B. On private property, such as parking lots
The study guide describes guards controlling traffic on private property, such as gated entrances to buildings and parking lots.
-
Vraag 25 van 25
Toon antwoord
Antwoord: A. All users, including traffic control persons
Book 7 says all users, including TCPs, must be trained in the manual, along with the job-specific training required under the OHSA.
Toetsenbord: 1–4 om te antwoorden, Enter voor de volgende vraag.
Wat je moet weten voor het examen
- In Ontario, a worker who directs traffic on a project must be competent and get written and oral instructions in a language they understand.
- A worker may not direct more than one lane of traffic in the same direction, or direct traffic where the posted speed limit is over 90 km/h.
- The STOP/SLOW sign is an octagon 450 mm across on a 1.2 m pole, red on the STOP side and fluorescent chartreuse on the SLOW side.
- Ontario TCPs wear a fluorescent orange garment with yellow stripes, and add silver stripes around the arms and legs at night.
- Every employer whose workers face traffic hazards on a project must write a traffic protection plan and keep it at the project.
- It is an offence for a driver to disobey STOP or SLOW signs shown by a traffic-control person.
Veelgestelde vragen
Do I need a licence to be a traffic control person in Ontario?
The construction regulation does not create a provincial TCP licence. It requires you to be competent and to get written and oral instructions from your employer, and Book 7 says TCPs must be trained in the manual.
Can a security guard direct traffic on a public road in Ontario?
A security licence gives no power over drivers on public roads. Guards may control traffic on private property. Directing traffic on a road is done by police, or by a competent worker on a road work project under O. Reg. 213/91.
What is the maximum speed limit for flagging in Ontario?
A worker may not direct traffic where the normal posted speed limit is more than 90 km/h.
What is Book 7?
Book 7 of the Ontario Traffic Manual, Temporary Conditions, is the MTO manual that shows standard layouts of signs, cones and traffic control persons for work zones.
Is het certificaat geaccrediteerd of officieel erkend?
Nee. Het is een privé bewijs van deelname, alleen voor je kennis. Het is niet erkend, geaccrediteerd of goedgekeurd door een overheid, vergunningsinstantie, toezichthouder of onderwijsinstelling, en het vervangt geen wettelijk verplichte vergunning, certificering of opleiding.
Bronnen
- O. Reg. 213/91: Construction Projects (e-Laws)
- IHSA OHS Guide: Traffic control safety (O. Reg. 213/91 ss. 67 to 69.1)
- IHSA OHS Guide: Traffic protection plan
- Ontario Traffic Manual Book 7, Field Edition, April 2022 (MTO)
- Ontario Traffic Manual Book 7, Office Edition (Publications Ontario)
- Official MTO Driver's Handbook: Dealing with particular situations
- Security guard study guide (Ontario.ca)